Fields / Troll / 31/5-J-21 AY1H
31/5-J-21 AY1H
Development, productionProducingOil
Drilled by Statoil Petroleum AS with COSLPromoter in Troll, 11.02.2015 to 10.03.2015 (27 days), to 4 994,0 m.
Water depth313,5 m
Total depth4 994,0 m MD
Vertical depth1 576,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigCOSLPromoter
Spud11.02.2015
Completed10.03.2015
OperatorStatoil Petroleum AS
Position60,7293 N, 3,6566 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-J-21 AY2H same well | 0,0 | 5 018,0 | - | - | 2015 |
| 31/5-J-21 AY3H same well | 0,0 | 5 051,0 | - | - | 2015 |
| 31/5-J-21 AY4H same well | 0,0 | 4 139,0 | - | - | 2015 |
| 31/5-J-21 Y1H same well | 0,0 | 5 347,0 | - | - | 2000 |
| 31/5-J-21 Y2H same well | 0,0 | 4 707,0 | - | - | 2000 |
| 31/5-J-22 AY1H | 0,0 | 5 263,0 | - | - | 2011 |
| 31/5-J-22 AY2H | 0,0 | 5 242,0 | - | - | 2011 |
| 31/5-J-22 AY3H | 0,0 | 5 201,0 | - | - | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.