Fields / Troll / 31/5-J-24 AY1H
31/5-J-24 AY1H
Development, productionClosedOil
Drilled by Norsk Hydro Produksjon AS with Deepsea Trym in Troll, 17.05.2007 to 18.07.2007 (62 days), to 3 607,0 m.
Water depth314,0 m
Total depth3 607,0 m MD
Vertical depth1 586,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigDeepsea Trym
Spud17.05.2007
Completed18.07.2007
OperatorNorsk Hydro Produksjon AS
Position60,7293 N, 3,6565 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-J-24 AY2H same well | 0,0 | 4 692,0 | - | - | 2007 |
| 31/5-J-24 AY3H same well | 0,0 | 4 881,0 | - | - | 2007 |
| 31/5-J-24 H same well | 0,0 | 4 605,0 | - | - | 1999 |
| 31/5-J-23 AH | 0,0 | 4 631,0 | - | - | 1999 |
| 31/5-J-23 BY1H | 0,0 | 5 960,0 | - | - | 2014 |
| 31/5-J-23 BY2H | 0,0 | 5 802,0 | - | - | 2014 |
| 31/5-J-23 BY3H | 0,0 | 6 577,0 | - | - | 2015 |
| 31/5-J-23 H | 0,0 | 1 837,0 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.