WellplannerNorwegian shelf well data

Fields / Statfjord / 33/12-2

33/12-2

Exploration, appraisalPlugged and abandonedOil

Drilled by Mobil Exploration Norway INC with Norskald in Statfjord, 06.06.1974 to 23.08.1974 (78 days), to 4 354,0 m in the Lomvi Formation.

Water depth147,0 m
Total depth4 354,0 m MD
Vertical depth-
Bottom-hole temperature107 °C
Max inclination-
Rotary table25,0 m
Formation at total depthLomvi Formation
RigNorskald
Spud06.06.1974
Completed23.08.1974
OperatorMobil Exploration Norway INC
Position61,2253 N, 1,8572 E

Formations

23 tops reported, measured depth in metres.

GroupsNordland Group, top 172,0 mNordland GpHordaland Group, top 953,0 mHordaland GpRogaland Group, top 1 678,0 mRogaland GpShetland Group, top 1 865,0 mShetland GpViking Group, top 2 480,0 mBrent Group, top 2 482,5 mDunlin Group, top 2 500,0 mDunlin GpStatfjord Group, top 2 700,0 mStatfjord GpHegre Group, top 2 951,0 mHegre GpFormationsBalder Formation, top 1 678,0 mSele Formation, top 1 721,0 mLista Formation, top 1 793,0 mJorsalfare Formation, top 1 865,0 mJorsalfare FmKyrre Formation, top 2 049,0 mKyrre FmDraupne Formation, top 2 480,0 mUndifferentiated, top 2 482,5 mUndifferentiated, top 2 500,0 mUndifferentiatedNansen Formation, top 2 700,0 mEiriksson Formation, top 2 719,0 mRaude Formation, top 2 790,0 mRaude FmLunde Formation, top 2 951,0 mLunde FmAlke Formation, top 3 749,0 mAlke FmLomvi Formation, top 4 048,0 mLomvi Fm1721 0002 0003 0004 0004 354

Temperature

Reported at total depth107 °C
Statfjord gradient26,8 °C/km
Estimated at total depth from the gradient116 °C

The gradient is the median of 8 released wells in Statfjord with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
33/12-32,31 725,0-1,221975
33/12-42,32 896,099 °C1,601975
33/12-B-32,53 660,0--1983
33/12-B-3 A2,54 630,0--2001
33/12-B-3 B2,53 944,0--2014
33/12-B-3 C2,53 986,0--2022
33/12-B-3 D2,5----
33/12-B-22,54 511,0--1991

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"222,036"222,0-
Surface casing20"493,026"503,0-
Intermediate13 3/8"1 600,017 1/2"1 615,0-
Intermediate9 5/8"2 908,012 1/4"2 920,0-
Open hole-4 354,08 1/2"4 354,0-

Mud weight

6 measurements, one dot each, 1,00 to 1,61 g/cm³ against measured depth, waterbased.

1,01,21,41,601 0002 0003 0004 000683,0 m: 1,09 g/cm³, waterbased1 666,0 m: 1,11 g/cm³, waterbased2 265,0 m: 1,57 g/cm³, waterbased2 492,0 m: 1,61 g/cm³, waterbased3 265,0 m: 1,55 g/cm³, waterbased3 520,0 m: 1,49 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
52 485,0 - 2 488,06,3--23037 661
42 526,0 - 2 533,0-----
32 701,0 - 2 704,06,3--28437 095
22 780,0 - 2 784,017,4--1 939142 716
12 813,0 - 2 818,017,4--87782 118
Show on the mapOpen on FactPages ↗