Fields / 33/12-N-3 GH
33/12-N-3 GH
Exploration, wildcatPluggedDry
Drilled by Equinor Energy AS with Askeladden, 29.11.2025 to 26.12.2025 (27 days), to 6 708,0 m.
Water depth137,1 m
Total depth6 708,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigAskeladden
Spud29.11.2025
Completed26.12.2025
OperatorEquinor Energy AS
Position61,0790 N, 1,9899 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 33/12-N-3 AH same well | 0,0 | 4 762,0 | - | - | 2006 |
| 33/12-N-3 BH same well | 0,0 | 3 210,0 | - | - | 2020 |
| 33/12-N-3 CH same well | 0,0 | 3 302,0 | - | - | 2020 |
| 33/12-N-3 DH same well | 0,0 | 3 782,0 | - | - | 2020 |
| 33/12-N-3 EH same well | 0,0 | 4 496,0 | - | - | 2020 |
| 33/12-N-3 FH same well | 0,0 | 3 252,0 | - | - | 2024 |
| 33/12-N-3 H same well | 0,0 | 3 685,0 | - | - | 2006 |
| 33/12-N-3 HH same well | 0,0 | 7 863,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.