Fields / 33/5-2
33/5-2
Exploration, wildcatPlugged and abandonedOil shows
Drilled by Norsk Hydro Produksjon AS with Nortrym, 31.07.1981 to 18.11.1981 (110 days), to 4 520,0 m in the Lunde Formation.
Water depth309,5 m
Total depth4 520,0 m MD
Vertical depth-
Bottom-hole temperature137 °C
Max inclination8,0°
Rotary table25,0 m
Formation at total depthLunde Formation
RigNortrym
Spud31.07.1981
Completed18.11.1981
OperatorNorsk Hydro Produksjon AS
Position61,6631 N, 1,6215 E
Formations
35 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 137 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 33/6-4 | 6,1 | 1 845,0 | 56 °C | 1,39 | 2012 |
| 33/5-1 | 9,5 | 3 829,0 | - | 1,56 | 1979 |
| 33/2-2 S | 9,9 | 3 530,0 | - | 1,78 | 2015 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 394,0 | 36" | 399,0 | - |
| Surface casing | 20" | 939,0 | 26" | 960,0 | 1,69 LOT |
| Intermediate | 13 3/8" | 1 975,0 | 17 1/2" | 2 020,0 | 1,81 LOT |
| Intermediate | 9 5/8" | 3 651,0 | 12 1/4" | 3 664,0 | 1,92 LOT |
| Liner | 7" | 4 261,0 | 8 1/2" | 4 279,0 | 2,07 LOT |
| Open hole | - | 4 520,0 | 6" | 4 520,0 | - |
Mud weight
7 measurements, one dot each, 1,00 to 1,45 g/cm³ against measured depth, spud mud, water mud.