WellplannerNorwegian shelf well data

Fields / Statfjord / 33/9-1

33/9-1

Exploration, appraisalPlugged and abandonedOil

Drilled by Mobil Exploration Norway INC with Norskald in Statfjord, 02.04.1974 to 04.06.1974 (63 days), to 3 126,0 m in the Statfjord Group.

Water depth146,0 m
Total depth3 126,0 m MD
Vertical depth-
Bottom-hole temperature94 °C
Max inclination-
Rotary table25,0 m
Formation at total depthStatfjord Group
RigNorskald
Spud02.04.1974
Completed04.06.1974
OperatorMobil Exploration Norway INC
Position61,2520 N, 1,8404 E

Formations

23 tops reported, measured depth in metres.

GroupsNordland Group, top 171,0 mNordland GpHordaland Group, top 821,0 mHordaland GpRogaland Group, top 1 661,0 mRogaland GpShetland Group, top 1 871,0 mShetland GpCromer Knoll Group, top 2 429,0 mViking Group, top 2 448,0 mBrent Group, top 2 464,0 mBrent GpDunlin Group, top 2 668,0 mDunlin GpStatfjord Group, top 2 923,0 mStatfjord GpFormationsUtsira Formation, top 750,0 mUtsira FmBalder Formation, top 1 661,0 mSele Formation, top 1 706,0 mSele FmDraupne Formation, top 2 448,0 mHeather Formation, top 2 451,5 mTarbert Formation, top 2 464,0 mNess Formation, top 2 506,0 mEtive Formation, top 2 567,0 mRannoch Formation, top 2 596,0 mBroom Formation, top 2 664,0 mDrake Formation, top 2 668,0 mCook Formation, top 2 715,0 mBurton Formation, top 2 801,0 mAmundsen Formation, top 2 838,0 mAmundsen Fm1715001 0001 5002 0002 5003 0003 126

Temperature

Reported at total depth94 °C
Statfjord gradient26,8 °C/km
Estimated at total depth from the gradient83 °C

The gradient is the median of 8 released wells in Statfjord with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
33/9-A-400,84 283,0--1986
33/9-A-40 A0,84 689,0--1996
33/9-A-40 B0,84 714,0--2001
33/9-A-40 C0,85 802,0--2005
33/9-A-40 D0,84 630,0--2007
33/9-A-350,84 851,0--1992
33/9-A-35 A0,85 735,0--1995
33/9-A-35 B0,85 564,0--2004

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"223,036"223,0-
Surface casing20"473,026"489,0-
Intermediate13 3/8"1 497,017 1/2"1 515,0-
Intermediate9 5/8"2 676,012 1/2"2 689,0-
Open hole-3 126,08 1/2"3 126,0-

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
32 465,0 - 2 474,06,3--23037 000
22 506,0 - 2 507,06,3--22031 000
12 615,0 - 2 626,012,0----
Show on the mapOpen on FactPages ↗