Fields / 33/9-16
33/9-16
Exploration, wildcatPlugged and abandonedShows
Drilled by Mobil Exploration Norway INC with Ross Isle, 28.11.1992 to 20.01.1993 (53 days), to 2 870,0 m in the Ness Formation.
Water depth227,0 m
Total depth2 870,0 m MD
Vertical depth2 870,0 m TVD
Bottom-hole temperature101 °C
Max inclination1,7°
Rotary table22,0 m
Formation at total depthNess Formation
RigRoss Isle
Spud28.11.1992
Completed20.01.1993
OperatorMobil Exploration Norway INC
Position61,3913 N, 1,9505 E
Formations
31 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 101 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 33/9-22 S | 0,8 | 2 730,0 | - | 1,54 | 2017 |
| 33/9-15 | 1,7 | 3 007,0 | 100 °C | 1,57 | 1992 |
| 33/9-G-3 H | 3,0 | 3 815,0 | - | - | 1996 |
| 33/9-U-5 | 3,0 | 2 680,0 | - | - | 2024 |
| 33/9-G-4 AH | 3,0 | 3 165,0 | - | - | 1999 |
| 33/9-G-4 H | 3,0 | 3 821,0 | - | - | 1999 |
| 33/9-U-6 | 3,0 | 700,0 | - | - | 2024 |
| 34/7-5 | 4,8 | 3 146,0 | 98 °C | 1,69 | 1985 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 296,0 | 36" | 296,0 | - |
| Intermediate | 20" | 402,0 | 26" | 407,0 | - |
| Intermediate | 13 3/8" | 1 100,0 | 17 1/2" | 1 106,0 | - |
| Intermediate | 9 5/8" | 2 172,0 | 12 1/4" | 2 185,0 | - |
| Open hole | - | 2 870,0 | 8 1/2" | 2 870,0 | - |
Mud weight
16 measurements, one dot each, 1,00 to 1,52 g/cm³ against measured depth, water based.