WellplannerNorwegian shelf well data

Fields / Statfjord / 33/9-3

33/9-3

Exploration, appraisalPlugged and abandonedOil

Drilled by Mobil Exploration Norway INC with Norskald in Statfjord, 15.09.1974 to 14.11.1974 (60 days), to 2 992,0 m in the Statfjord Group.

Water depth146,0 m
Total depth2 992,0 m MD
Vertical depth-
Bottom-hole temperature86 °C
Max inclination-
Rotary table25,0 m
Formation at total depthStatfjord Group
RigNorskald
Spud15.09.1974
Completed14.11.1974
OperatorMobil Exploration Norway INC
Position61,2986 N, 1,8944 E

Formations

21 tops reported, measured depth in metres.

GroupsNordland Group, top 171,0 mNordland GpHordaland Group, top 926,0 mHordaland GpRogaland Group, top 1 662,0 mRogaland GpShetland Group, top 1 860,0 mShetland GpCromer Knoll Group, top 2 397,0 mViking Group, top 2 405,0 mBrent Group, top 2 411,0 mBrent GpDunlin Group, top 2 599,0 mDunlin GpStatfjord Group, top 2 849,0 mStatfjord GpHegre Group, top 2 973,0 mFormationsUtsira Formation, top 844,0 mUtsira FmBalder Formation, top 1 662,0 mSele Formation, top 1 705,0 mSele FmDraupne Formation, top 2 405,0 mTarbert Formation, top 2 411,0 mNess Formation, top 2 458,0 mEtive Formation, top 2 508,0 mRannoch Formation, top 2 540,0 mDrake Formation, top 2 599,0 mCook Formation, top 2 644,0 mBurton Formation, top 2 655,0 mBurton Fm1715001 0001 5002 0002 5003 0003 003

Temperature

Reported at total depth86 °C
Statfjord gradient26,8 °C/km
Estimated at total depth from the gradient80 °C

The gradient is the median of 8 released wells in Statfjord with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
33/9-20,0940,0-1,201974
33/9-C-420,53 540,0--1985
33/9-C-42 A0,55 300,0--1998
33/9-C-40,54 977,3--1987
33/9-C-4 A0,55 627,0--2001
33/9-C-4 B0,54 053,0--2003
33/9-C-4 C0,54 318,0--2014
33/9-C-4 D0,54 191,0--2025

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"221,036"221,0-
Surface casing20"458,026"471,0-
Intermediate13 3/8"926,017 1/2"941,0-
Intermediate9 5/8"2 147,012 1/4"2 159,0-
Intermediate-2 992,08 1/2"2 992,0-

Mud weight

4 measurements, one dot each, 1,00 to 1,80 g/cm³ against measured depth, waterbased.

1,01,21,41,61,805001 0001 5002 0002 500837,0 m: 1,08 g/cm³, Waterbased1 311,0 m: 1,68 g/cm³, Waterbased2 281,0 m: 1,80 g/cm³, Waterbased2 991,0 m: 1,41 g/cm³, Waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
12 479,0 - 2 481,0-----
Show on the mapOpen on FactPages ↗