Fields / Statfjord / 33/9-A-26
33/9-A-26
Development, injectionPluggedWater
Drilled by Mobil Exploration Norway INC with Statfjord A in Statfjord, 14.10.1985 to 03.01.1986 (81 days), to 5 161,0 m.
Water depth145,3 m
Total depth5 161,0 m MD
Vertical depth2 819,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table64,4 m
Formation at total depth-
RigStatfjord A
Spud14.10.1985
Completed03.01.1986
OperatorMobil Exploration Norway INC
Position61,2555 N, 1,8539 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Statfjord gradient | 26,8 °C/km |
| Estimated at total depth from the gradient | 74 °C |
The gradient is the median of 8 released wells in Statfjord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 33/9-A-26 A same well | 0,0 | 5 128,0 | - | - | 2000 |
| 33/9-A-26 B same well | 0,0 | 4 895,0 | - | - | 2004 |
| 33/9-A-27 | 0,0 | 5 092,0 | - | - | 1991 |
| 33/9-A-27 A | 0,0 | 5 513,0 | - | - | 1993 |
| 33/9-A-27 B | 0,0 | 4 082,0 | - | - | 1999 |
| 33/9-A-27 C | 0,0 | 4 000,0 | - | - | 2008 |
| 33/9-A-27 D | 0,0 | 2 604,0 | - | - | 2021 |
| 33/9-A-31 | 0,0 | 3 573,0 | - | - | 1982 |
Casing and formation tests
No casing programme is reported for this wellbore.