WellplannerNorwegian shelf well data

Fields / Gullfaks / 34/10-13

34/10-13

Exploration, appraisalPlugged and abandonedOil

Drilled by Den norske stats oljeselskap a.s with Deepsea Saga in Gullfaks, 24.08.1981 to 05.01.1982 (134 days), to 3 392,0 m in the Hegre Group.

Water depth214,0 m
Total depth3 392,0 m MD
Vertical depth3 391,0 m TVD
Bottom-hole temperature108 °C
Max inclination3,8°
Rotary table25,0 m
Formation at total depthHegre Group
RigDeepsea Saga
Spud24.08.1981
Completed05.01.1982
OperatorDen norske stats oljeselskap a.s
Position61,2005 N, 2,3008 E

Formations

11 tops reported, measured depth in metres.

GroupsNordland Group, top 239,0 mNordland GpHordaland Group, top 956,0 mHordaland GpRogaland Group, top 1 539,0 mRogaland GpShetland Group, top 1 707,0 mShetland GpDunlin Group, top 1 905,0 mStatfjord Group, top 1 924,0 mStatfjord GpHegre Group, top 2 052,0 mHegre GpFormationsUtsira Formation, top 942,0 mUtsira FmBalder Formation, top 1 539,0 mLista Formation, top 1 596,0 mLista FmAmundsen Formation, top 1 905,0 mAmundsen Fm2391 0002 0003 0003 392

Temperature

Reported at total depth108 °C
Gullfaks gradient34,7 °C/km
Estimated at total depth from the gradient113 °C

The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/10-71,42 250,090 °C1,851980
34/10-7 R1,42 247,090 °C-1983
34/10-C-322,15 100,0--1996
34/10-C-32 A2,14 023,0--2015
34/10-C-202,15 334,0--1994
34/10-C-20 AY12,14 712,0--1996
34/10-C-20 AY22,16 580,0--2006
34/10-C-52,13 585,0--1990

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"299,036"300,0-
Surface casing20"869,026"893,01,47 LOT
Intermediate13 3/8"1 536,017 1/2"1 542,01,80 LOT
Intermediate9 5/8"1 720,012 1/4"1 725,01,95 LOT
Liner7"2 680,08 1/2"2 700,01,96 LOT
Open hole-3 391,56"3 392,0-

Mud weight

7 measurements, one dot each, 1,00 to 1,86 g/cm³ against measured depth, waterbased.

1,01,21,41,61,801 0002 0003 000300,0 m: 1,06 g/cm³, waterbased875,0 m: 1,11 g/cm³, waterbased1 380,0 m: 1,25 g/cm³, waterbased1 630,0 m: 1,60 g/cm³, waterbased1 900,0 m: 1,85 g/cm³, waterbased2 425,0 m: 1,86 g/cm³, waterbased3 392,0 m: 1,65 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
22 003,0 - 2 009,012,7--86082 000
12 107,0 - 2 114,012,7--46738 000
Show on the mapOpen on FactPages ↗