WellplannerNorwegian shelf well data

Fields / Gullfaks / 34/10-4

34/10-4

Exploration, appraisalPlugged and abandonedOil

Drilled by Den norske stats oljeselskap a.s with Ross Rig (1) in Gullfaks, 12.08.1979 to 15.10.1979 (64 days), to 2 600,0 m in the Lunde Formation.

Water depth197,0 m
Total depth2 600,0 m MD
Vertical depth2 598,0 m TVD
Bottom-hole temperature77 °C
Max inclination-
Rotary table25,0 m
Formation at total depthLunde Formation
RigRoss Rig (1)
Spud12.08.1979
Completed15.10.1979
OperatorDen norske stats oljeselskap a.s
Position61,2043 N, 2,2322 E

Formations

27 tops reported, measured depth in metres.

GroupsNordland Group, top 223,0 mNordland GpHordaland Group, top 962,0 mHordaland GpRogaland Group, top 1 520,0 mRogaland GpShetland Group, top 1 690,0 mShetland GpBrent Group, top 1 816,0 mBrent GpDunlin Group, top 1 916,0 mDunlin GpStatfjord Group, top 2 340,0 mStatfjord GpHegre Group, top 2 481,0 mHegre GpFormationsUtsira Formation, top 950,0 mUtsira FmNo Formal Name, top 1 110,0 mNo Formal NameNo Formal Name, top 1 227,0 mNo Formal Name, top 1 273,0 mNo Formal Name, top 1 340,0 mNo Formal NameBalder Formation, top 1 520,0 mLista Formation, top 1 580,0 mLista FmJorsalfare Formation, top 1 690,0 mKyrre Formation, top 1 745,0 mRannoch Formation, top 1 816,0 mRannoch FmBroom Formation, top 1 905,0 mDrake Formation, top 1 916,0 mDrake FmCook Formation, top 2 025,0 mCook FmBurton Formation, top 2 165,0 mAmundsen Formation, top 2 175,0 mAmundsen FmNansen Formation, top 2 340,0 mNansen FmEiriksson Formation, top 2 435,0 mRaude Formation, top 2 458,0 mLunde Formation, top 2 481,0 mLunde Fm2235001 0001 5002 0002 5002 600

Temperature

Reported at total depth77 °C
Drill-stem test at 1 885,0 m72 °C
Gullfaks gradient34,7 °C/km
Estimated at total depth from the gradient86 °C

The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/10-251,5600,029 °C1,031985
34/10-91,62 200,064 °C1,821980
34/10-9 R1,62 421,095 °C1,691980
34/10-B-231,62 985,0--1992
34/10-B-191,62 960,0--1991
34/10-B-19 A1,63 061,0--1992
34/10-B-71,62 500,0--1989
34/10-B-7 A1,64 139,0--2002

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"273,036"274,0-
Surface casing20"627,026"641,01,52 LOT
Intermediate13 3/8"1 438,017 1/2"1 450,01,67 LOT
Intermediate9 5/8"1 693,012 1/4"1 704,01,98 LOT
Liner7"1 981,08 1/2"1 985,02,05 LOT
Open hole-2 600,06"2 600,0-

Mud weight

8 measurements, one dot each, 1,10 to 1,75 g/cm³ against measured depth, waterbased.

1,11,31,51,705001 0001 5002 0002 500639,0 m: 1,10 g/cm³, waterbased891,0 m: 1,13 g/cm³, waterbased1 104,0 m: 1,16 g/cm³, waterbased1 311,0 m: 1,29 g/cm³, waterbased1 458,0 m: 1,50 g/cm³, waterbased1 750,0 m: 1,75 g/cm³, waterbased1 959,0 m: 1,75 g/cm³, waterbased2 438,0 m: 1,72 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
21 824,0 - 1 826,014,7-7181067 400
11 880,0 - 1 885,07,9-7227924 300
Show on the mapOpen on FactPages ↗