Fields / Gullfaks / 34/10-A-25 C
34/10-A-25 C
Development, injectionInjectingWater
Drilled by Equinor Energy AS with Gullfaks A in Gullfaks, 26.08.2019 to 23.11.2019 (89 days), to 3 913,0 m.
Water depth134,3 m
Total depth3 913,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table82,2 m
Formation at total depth-
RigGullfaks A
Spud26.08.2019
Completed23.11.2019
OperatorEquinor Energy AS
Position61,1763 N, 2,1893 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 132 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-A-25 same well | 0,0 | 3 405,0 | - | - | 1989 |
| 34/10-A-25 A same well | 0,0 | 3 550,0 | - | - | 1989 |
| 34/10-A-25 B same well | 0,0 | 4 250,0 | - | - | 2004 |
| 34/10-A-21 | 0,0 | 3 340,0 | - | - | 1989 |
| 34/10-A-21 A | 0,0 | 4 569,0 | - | - | 1999 |
| 34/10-A-21 B | 0,0 | 4 785,0 | - | - | 2026 |
| 34/10-A-32 | 0,0 | 2 696,0 | - | - | 1991 |
| 34/10-A-32 A | 0,0 | 2 926,0 | - | - | 1993 |
Casing and formation tests
No casing programme is reported for this wellbore.