Fields / Gullfaks / 34/10-B-17 A
34/10-B-17 A
Development, productionPluggedOil
Drilled by Statoil ASA (old) with Gullfaks B in Gullfaks, 14.11.2006 to 18.12.2006 (34 days), to 2 865,0 m.
Water depth142,9 m
Total depth2 865,0 m MD
Vertical depth1 937,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table80,7 m
Formation at total depth-
RigGullfaks B
Spud14.11.2006
Completed18.12.2006
OperatorStatoil ASA (old)
Position61,2031 N, 2,2012 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 63 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-B-17 same well | 0,0 | 2 590,0 | - | - | 1991 |
| 34/10-B-17 B same well | 0,0 | 3 008,0 | - | - | 2020 |
| 34/10-B-17 C same well | 0,0 | - | - | - | - |
| 34/10-B-41 | 0,0 | 4 742,0 | - | - | 2000 |
| 34/10-B-41 A | 0,0 | 4 821,0 | - | - | 2000 |
| 34/10-B-41 B | 0,0 | 4 933,0 | - | - | 2024 |
| 34/10-B-41 C | 0,0 | 6 496,2 | - | - | 2026 |
| 34/10-B-11 | 0,0 | 3 725,0 | - | - | 1989 |
Casing and formation tests
No casing programme is reported for this wellbore.