Fields / Gullfaks / 34/10-B-20 A
34/10-B-20 A
Development, injectionClosedWater
Drilled by Statoil ASA (old) with Gullfaks B in Gullfaks, 13.02.2007 to 02.04.2007 (48 days), to 5 125,0 m.
Water depth142,5 m
Total depth5 125,0 m MD
Vertical depth2 141,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table81,0 m
Formation at total depth-
RigGullfaks B
Spud13.02.2007
Completed02.04.2007
OperatorStatoil ASA (old)
Position61,2031 N, 2,2014 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 70 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-B-20 same well | 0,0 | 3 425,0 | - | - | 1992 |
| 34/10-B-28 | 0,0 | 4 891,0 | - | - | 1993 |
| 34/10-B-28 A | 0,0 | 4 532,0 | - | - | 2016 |
| 34/10-B-28 B | 0,0 | 5 986,0 | - | - | 2025 |
| 34/10-B-8 | 0,0 | 3 302,8 | - | - | 1989 |
| 34/10-B-8 A | 0,0 | 4 060,0 | - | - | 2019 |
| 34/10-B-8 B | 0,0 | 3 705,0 | - | - | 2019 |
| 34/10-B-18 | 0,0 | 4 570,0 | - | - | 1991 |
Casing and formation tests
No casing programme is reported for this wellbore.