WellplannerNorwegian shelf well data

Fields / Gullfaks / 34/10-B-27 A

34/10-B-27 A

Development, productionPluggedOil and gas

Drilled by Statoil ASA (old) with Gullfaks B in Gullfaks, 28.05.2004 to 21.06.2004 (24 days), to 4 329,0 m.

Water depth142,5 m
Total depth4 329,0 m MD
Vertical depth2 028,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table80,7 m
Formation at total depth-
RigGullfaks B
Spud28.05.2004
Completed21.06.2004
OperatorStatoil ASA (old)
Position61,2028 N, 2,2017 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gullfaks gradient34,7 °C/km
Estimated at total depth from the gradient67 °C

The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/10-B-27 same well0,03 400,0--1993
34/10-B-27 B same well0,02 672,0--2022
34/10-B-20,02 963,0--1988
34/10-B-2 A0,02 723,0--2008
34/10-B-2 B0,05 173,0--2018
34/10-B-310,04 250,0--1994
34/10-B-31 A0,03 118,0--2001
34/10-B-380,05 015,0--1997

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗