Fields / Gullfaks / 34/10-B-29 D
34/10-B-29 D
Development, injectionInjectingWater
Drilled by Equinor Energy AS with Gullfaks B in Gullfaks, 19.02.2026 to 18.06.2026 (119 days), to 5 429,0 m.
Water depth134,3 m
Total depth5 429,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table82,2 m
Formation at total depth-
RigGullfaks B
Spud19.02.2026
Completed18.06.2026
OperatorEquinor Energy AS
Position61,2027 N, 2,2017 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 185 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-B-29 same well | 0,0 | 5 580,0 | - | - | 1993 |
| 34/10-B-29 A same well | 0,0 | 5 723,0 | - | - | 1993 |
| 34/10-B-29 B same well | 0,0 | 6 710,0 | - | - | 1993 |
| 34/10-B-29 C same well | 0,0 | 5 848,0 | - | - | 2016 |
| 34/10-B-39 | 0,0 | 4 999,0 | - | - | 1998 |
| 34/10-B-39 A | 0,0 | 3 615,0 | - | - | 1998 |
| 34/10-B-39 B | 0,0 | 4 000,0 | - | - | 2003 |
| 34/10-45 A | 0,0 | 6 523,0 | - | 1,62 | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.