Fields / Gullfaks / 34/10-B-35
34/10-B-35
Development, injectionPluggedWater
Drilled by Den norske stats oljeselskap a.s with Gullfaks B in Gullfaks, 13.08.1995 to 20.10.1995 (68 days), to 5 900,0 m.
Water depth142,6 m
Total depth5 900,0 m MD
Vertical depth2 375,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table80,7 m
Formation at total depth-
RigGullfaks B
Spud13.08.1995
Completed20.10.1995
OperatorDen norske stats oljeselskap a.s
Position61,2030 N, 2,2014 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 79 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-40 S | 0,0 | 5 900,0 | - | 1,35 | 1995 |
| 34/10-B-35 A same well | 0,0 | 2 212,0 | - | - | 2012 |
| 34/10-B-35 B same well | 0,0 | 4 974,0 | - | - | 2012 |
| 34/10-B-14 | 0,0 | 4 489,0 | - | - | 1990 |
| 34/10-B-14 A | 0,0 | 4 532,0 | - | - | 1990 |
| 34/10-B-14 B | 0,0 | 3 025,0 | - | - | 2013 |
| 34/10-B-14 C | 0,0 | 5 620,0 | - | - | 2017 |
| 34/10-B-1 | 0,0 | 2 595,0 | - | - | 1987 |
Casing and formation tests
No casing programme is reported for this wellbore.