Fields / Gullfaks / 34/10-C-27
34/10-C-27
Development, productionClosedOil and gas
Drilled by Den norske stats oljeselskap a.s with Gullfaks C in Gullfaks, 06.04.1995 to 14.05.1995 (38 days), to 4 930,0 m.
Water depth216,0 m
Total depth4 930,0 m MD
Vertical depth2 054,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table84,0 m
Formation at total depth-
RigGullfaks C
Spud06.04.1995
Completed14.05.1995
OperatorDen norske stats oljeselskap a.s
Position61,2152 N, 2,2739 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 65 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-C-27 A same well | 0,0 | 3 200,0 | - | - | 2026 |
| 34/10-C-6 | 0,0 | 3 200,0 | - | - | 1991 |
| 34/10-C-6 A | 0,0 | 4 800,0 | - | - | 2009 |
| 34/10-C-6 B | 0,0 | 5 073,0 | - | - | 2018 |
| 34/10-C-38 | 0,0 | 4 338,0 | - | - | 1998 |
| 34/10-C-38 A | 0,0 | 3 280,0 | - | - | 2015 |
| 34/10-C-38 B | 0,0 | 3 786,0 | - | - | 2015 |
| 34/10-C-38 C | 0,0 | 3 943,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.