34/10-C-8
Development, productionPluggedOil
Drilled by Den norske stats oljeselskap a.s with Gullfaks C in Gullfaks, 27.06.1991 to 11.08.1991 (45 days), to 2 880,0 m.
Water depth216,0 m
Total depth2 880,0 m MD
Vertical depth2 450,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table84,0 m
Formation at total depth-
RigGullfaks C
Spud27.06.1991
Completed11.08.1991
OperatorDen norske stats oljeselskap a.s
Position61,2152 N, 2,2741 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 79 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-C-8 A same well | 0,0 | 3 098,0 | - | - | 2015 |
| 34/10-C-8 B same well | 0,0 | 4 276,0 | - | - | 2018 |
| 34/10-C-31 | 0,0 | 4 381,0 | - | - | 1995 |
| 34/10-C-40 | 0,0 | 2 274,0 | - | - | 1998 |
| 34/10-C-40 A | 0,0 | 2 296,0 | - | - | 2017 |
| 34/10-C-40 B | 0,0 | 3 334,0 | - | - | 2026 |
| 34/10-55 S | 0,0 | 7 811,0 | - | 1,64 | 2017 |
| 34/10-C-52 | 0,0 | 5 979,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.