Fields / Gullfaks Sør / 34/10-E-3 H
34/10-E-3 H
Development, injectionClosedGas
Drilled by Statoil Petroleum AS with Songa Dee in Gullfaks Sør, 15.05.2013 to 14.08.2013 (91 days), to 4 456,0 m.
Water depth133,0 m
Total depth4 456,0 m MD
Vertical depth3 418,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigSonga Dee
Spud15.05.2013
Completed14.08.2013
OperatorStatoil Petroleum AS
Position61,1107 N, 2,2606 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks Sør gradient | 36,5 °C/km |
| Estimated at total depth from the gradient | 123 °C |
The gradient is the median of 24 released wells in Gullfaks Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-E-2 AH | 0,0 | 3 733,0 | - | - | 2011 |
| 34/10-E-2 H | 0,0 | 4 945,0 | - | - | 2000 |
| 34/10-E-4 AH | 0,0 | 4 669,0 | - | - | 2002 |
| 34/10-E-4 BH | 0,0 | 4 939,0 | - | - | 2006 |
| 34/10-E-4 CH | 0,0 | 4 775,0 | - | - | 2012 |
| 34/10-E-4 H | 0,0 | 4 125,0 | - | - | 1998 |
| 34/10-E-1 AH | 0,0 | 5 930,0 | - | - | 2021 |
| 34/10-E-1 Y1H | 0,0 | 3 800,0 | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.