Fields / 34/11-U-8
34/11-U-8
Other, soil drillingPlugged and abandoned
Drilled by StatoilHydro Petroleum AS with Bucentaur, 20.06.2009 to 20.06.2009 (0 days).
Water depth133,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud20.06.2009
Completed20.06.2009
OperatorStatoilHydro Petroleum AS
Position61,0397 N, 2,3401 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/11-U-9 | 0,1 | - | - | - | 2009 |
| 34/11-U-7 | 0,1 | - | - | - | 2009 |
| 34/11-U-5 | 0,1 | - | - | - | 2009 |
| 34/11-U-6 | 0,1 | - | - | - | 2009 |
| 34/11-U-4 | 0,1 | - | - | - | 2009 |
| 34/11-U-11 | 0,1 | 300,0 | - | - | 2009 |
| 34/11-U-12 | 0,1 | 1 250,0 | - | - | 2009 |
| 34/11-B-16 | 0,1 | 6 630,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.