34/3-A-3 AH
Development, productionPlugged and abandonedOil
Drilled by A/S Norske Shell with Borgland Dolphin in Knarr, 27.02.2020 to 14.05.2020 (77 days), to 5 300,0 m.
Water depth412,0 m
Total depth5 300,0 m MD
Vertical depth3 898,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,2 m
Formation at total depth-
RigBorgland Dolphin
Spud27.02.2020
Completed14.05.2020
OperatorA/S Norske Shell
Position61,8120 N, 2,7735 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Knarr gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 136 °C |
The gradient is the median of 3 released wells in Knarr with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/3-A-3 H same well | 0,0 | 988,0 | - | - | 2013 |
| 34/3-U-19 | 0,0 | - | - | - | - |
| 34/3-A-4 H | 0,0 | 4 306,0 | - | - | 2013 |
| 34/3-A-2 H | 0,0 | 4 600,0 | - | - | 2013 |
| 34/3-A-1 H | 0,0 | 4 600,0 | - | - | 2013 |
| 34/3-U-21 | 0,2 | - | - | - | - |
| 34/3-1 A | 0,3 | 4 162,0 | - | 1,87 | 2008 |
| 34/3-1 S | 0,3 | 4 221,0 | 142 °C | 1,87 | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.