WellplannerNorwegian shelf well data

Fields / 34/4-13 S

34/4-13 S

Exploration, appraisalPlugged and abandonedOil

Drilled by Petro-Canada Norge AS with West Alpha, 27.08.2010 to 02.01.2011 (128 days), to 5 010,0 m in the Lunde Formation.

Water depth374,0 m
Total depth5 010,0 m MD
Vertical depth4 291,0 m TVD
Bottom-hole temperature151 °C
Max inclination37,5°
Rotary table18,0 m
Formation at total depthLunde Formation
RigWest Alpha
Spud27.08.2010
Completed02.01.2011
OperatorPetro-Canada Norge AS
Position61,6453 N, 2,1001 E

Formations

20 tops reported, measured depth in metres.

GroupsNordland Group, top 392,0 mNordland GpHordaland Group, top 1 305,0 mHordaland GpRogaland Group, top 1 852,5 mRogaland GpShetland Group, top 2 062,5 mShetland GpCromer Knoll Group, top 4 352,0 mViking Group, top 4 422,0 mBrent Group, top 4 499,0 mDunlin Group, top 4 525,0 mDunlin GpStatfjord Group, top 4 800,0 mHegre Group, top 4 905,0 mFormationsUtsira Formation, top 1 284,0 mUtsira FmBalder Formation, top 1 852,5 mSele Formation, top 1 909,0 mLista Formation, top 1 980,0 mJorsalfare Formation, top 2 062,5 mJorsalfare FmKyrre Formation, top 2 400,0 mKyrre FmSvarte Formation, top 4 171,0 mSvarte FmDraupne Formation, top 4 422,0 mHeather Formation, top 4 472,0 mHeather FmLunde Formation, top 4 905,0 m3921 0002 0003 0004 0005 0005 010

Temperature

Reported at total depth151 °C
Drill-stem test at 4 815,0 m115 °C

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/4-110,14 327,0144 °C2,002009
34/4-102,52 380,0-1,542000
34/4-10 R2,54 246,0145 °C1,832000
34/4-14 S4,14 822,0154 °C1,942015
34/4-34,24 460,0127 °C1,561981
34/4-87,73 110,0104 °C1,621994
34/4-U-67,8---2022
34/4-U-48,1514,0--2022

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"470,036"471,0-
Pilot hole-600,09 7/8"600,0-
Surface casing20"1 472,626"1 480,0-
Surface casing13 3/8"2 903,017 1/2"2 908,01,86 LOT
Intermediate9 5/8"4 376,012 1/4"4 382,02,20 LOT
Liner7"5 009,08 1/2"5 010,0-

Mud weight

23 measurements, one dot each, 0,90 to 2,09 g/cm³ against measured depth, cabr2 brine, versatec, versatherm, bentonite spud, cmc, versatherm.

0,91,41,901 0002 0003 0004 0005 000415,0 m: 1,02 g/cm³, cmc474,0 m: 1,49 g/cm³, bentonite spud600,0 m: 1,02 g/cm³, bentonite spud1 480,0 m: 1,24 g/cm³, bentonite spud1 633,0 m: 1,50 g/cm³, Versatec2 908,0 m: 1,53 g/cm³, Versatec2 993,0 m: 1,66 g/cm³, Versatec3 556,0 m: 1,71 g/cm³, Versatec4 004,0 m: 0,99 g/cm³, Versatec4 330,0 m: 0,99 g/cm³, Versatec4 382,0 m: 1,73 g/cm³, Versatec4 383,0 m: 1,71 g/cm³, Versatec4 525,0 m: 2,03 g/cm³, Versatherm4 802,0 m: 1,99 g/cm³, Versatherm4 829,0 m: 1,99 g/cm³, Versatherm4 915,0 m: 1,99 g/cm³, Versatherm5 007,0 m: 1,99 g/cm³, versatherm5 007,0 m: 1,73 g/cm³, versatherm5 007,0 m: 1,70 g/cm³, CaBr2 Brine5 007,0 m: 1,70 g/cm³, CaBr2 Brine5 010,0 m: 1,99 g/cm³, Versatherm5 010,0 m: 2,09 g/cm³, Versatherm5 010,0 m: 1,99 g/cm³, Versatherm

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
14 803,0 - 4 815,013,674,91151 400-
Show on the mapOpen on FactPages ↗