34/4-C-1 H
Development, productionProducingOil
Drilled by StatoilHydro ASA with Snorre B in Snorre, 11.10.2007 to 16.12.2007 (66 days), to 5 104,0 m.
Water depth346,0 m
Total depth5 104,0 m MD
Vertical depth2 475,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table37,0 m
Formation at total depth-
RigSnorre B
Spud11.10.2007
Completed16.12.2007
OperatorStatoilHydro ASA
Position61,5251 N, 2,2111 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Snorre gradient | 36,2 °C/km |
| Estimated at total depth from the gradient | 80 °C |
The gradient is the median of 12 released wells in Snorre with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/4-C-1 AH same well | 0,0 | - | - | - | - |
| 34/4-C-2 AH | 0,0 | 4 184,0 | - | - | 2015 |
| 34/4-C-2 H | 0,0 | 5 040,0 | - | - | 2000 |
| 34/4-C-8 H | 0,0 | 4 643,0 | - | - | 2011 |
| 34/4-C-3 H | 0,0 | 3 947,0 | - | - | 2015 |
| 34/4-C-7 AH | 0,0 | 4 950,0 | - | - | 2007 |
| 34/4-C-7 H | 0,0 | 4 190,0 | - | - | 2006 |
| 34/4-C-6 AH | 0,0 | 4 770,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.