34/4-D-4 BH
Development, productionProducing
Drilled by Equinor Energy AS with Snorre B in Snorre, 09.01.2023 to 23.07.2023 (195 days), to 4 188,0 m.
Water depth347,0 m
Total depth4 188,0 m MD
Vertical depth2 543,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table37,0 m
Formation at total depth-
RigSnorre B
Spud09.01.2023
Completed23.07.2023
OperatorEquinor Energy AS
Position61,5257 N, 2,2114 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Snorre gradient | 36,2 °C/km |
| Estimated at total depth from the gradient | 82 °C |
The gradient is the median of 12 released wells in Snorre with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/4-D-4 AH same well | 0,0 | 4 969,0 | - | - | 2017 |
| 34/4-D-4 H same well | 0,0 | 5 011,0 | - | - | 2003 |
| 34/4-D-3 AH | 0,0 | 5 858,0 | - | - | 2024 |
| 34/4-D-3 H | 0,0 | 5 485,0 | - | - | 2012 |
| 34/4-D-5 H | 0,0 | 6 119,0 | - | - | 2014 |
| 34/4-D-2 AH | 0,0 | 5 421,0 | - | - | 2004 |
| 34/4-D-2 H | 0,0 | 3 877,0 | - | - | 2004 |
| 34/4-D-6 H | 0,0 | 6 280,0 | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.