WellplannerNorwegian shelf well data

Fields / Tordis / 34/7-26 S

34/7-26 S

Exploration, appraisalSuspendedDry

Drilled by Saga Petroleum ASA with Scarabeo 5 in Tordis, 19.08.1997 to 13.09.1997 (25 days), to 4 193,0 m in the Kyrre Formation.

Water depth201,0 m
Total depth4 193,0 m MD
Vertical depth2 248,0 m TVD
Bottom-hole temperature-
Max inclination65,5°
Rotary table25,0 m
Formation at total depthKyrre Formation
RigScarabeo 5
Spud19.08.1997
Completed13.09.1997
OperatorSaga Petroleum ASA
Position61,2748 N, 2,1199 E

Formations

17 tops reported, measured depth in metres.

GroupsNordland Group, top 226,0 mNordland GpHordaland Group, top 1 338,0 mHordaland GpRogaland Group, top 2 896,0 mRogaland GpShetland Group, top 3 340,0 mShetland GpFormationsUtsira Formation, top 1 300,0 mUtsira FmNo Formal Name, top 1 555,0 mNo Formal Name, top 1 617,0 mNo Formal Name, top 1 665,0 mNo Formal NameNo Formal Name, top 1 867,0 mNo Formal Name, top 1 980,0 mNo Formal Name, top 2 098,0 mNo Formal Name, top 2 187,0 mNo Formal Name, top 2 223,0 mNo Formal NameBalder Formation, top 2 896,0 mLista Formation, top 3 016,0 mLista FmJorsalfare Formation, top 3 340,0 mJorsalfare FmKyrre Formation, top 3 866,0 mKyrre Fm2261 0002 0003 0004 0004 193

Temperature

Reported at total depth-
Tordis gradient37,1 °C/km
Estimated at total depth from the gradient79 °C

The gradient is the median of 9 released wells in Tordis with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/7-26 A same well0,04 290,091 °C1,621998
34/7-26 SR same well0,04 690,0--1998
34/7-J-3 AH0,04 769,0--2002
34/7-J-3 H0,04 290,0--1998
34/7-J-4 AH0,04 187,0--2021
34/7-J-4 BH0,05 197,0--2021
34/7-J-4 H0,05 001,0--2000
34/7-J-2 AH0,03 931,0--2006

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"275,036"275,0-
Surface casing18 5/8"346,026"347,0-
Intermediate13 3/8"1 371,017 1/2"1 373,01,60 LOT
Intermediate9 5/8"4 181,012 1/4"4 182,01,67 LOT
Show on the mapOpen on FactPages ↗