Fields / 34/7-32
34/7-32
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Hydro Produksjon AS with Byford Dolphin, 09.10.2001 to 27.10.2001 (18 days), to 2 651,0 m in the Drake Formation.
Water depth297,0 m
Total depth2 651,0 m MD
Vertical depth2 651,0 m TVD
Bottom-hole temperature79 °C
Max inclination1,2°
Rotary table25,0 m
Formation at total depthDrake Formation
RigByford Dolphin
Spud09.10.2001
Completed27.10.2001
OperatorNorsk Hydro Produksjon AS
Position61,4473 N, 2,0545 E
Formations
14 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 79 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-20 | 1,3 | 3 177,0 | 100 °C | 1,64 | 1992 |
| 34/7-7 | 2,4 | 3 526,0 | 120 °C | 1,68 | 1985 |
| 34/7-28 | 3,1 | 3 005,0 | 104 °C | 1,59 | 1997 |
| 33/9-N-3 H | 4,0 | 3 791,0 | - | - | 2000 |
| 33/9-N-4 H | 4,0 | - | - | - | - |
| 33/9-N-2 AH | 4,0 | 4 045,0 | - | - | 2017 |
| 33/9-N-2 H | 4,0 | 4 060,0 | - | - | 2002 |
| 33/9-N-1 H | 4,0 | 3 091,0 | - | - | 2000 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 381,0 | 36" | 384,0 | - |
| Pilot hole | - | 700,0 | 9 5/8" | 700,0 | - |
| Surface casing | 13 3/8" | 1 378,0 | 17 1/2" | 1 385,0 | 1,62 LOT |
| Open hole | - | 2 651,0 | 9 1/2" | 2 651,0 | - |
Mud weight
6 measurements, one dot each, 1,00 to 1,48 g/cm³ against measured depth, bentonite/fw, cmc/seawater, versavert.