34/7-A-4 AH
Development, injectionClosedWater
Drilled by Norsk Hydro Produksjon AS with Scarabeo 5 in Snorre, 07.08.2002 to 12.09.2002 (36 days), to 4 251,0 m.
Water depth335,0 m
Total depth4 251,0 m MD
Vertical depth2 529,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud07.08.2002
Completed12.09.2002
OperatorNorsk Hydro Produksjon AS
Position61,4893 N, 2,2265 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Snorre gradient | 36,2 °C/km |
| Estimated at total depth from the gradient | 83 °C |
The gradient is the median of 12 released wells in Snorre with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-A-4 H same well | 0,0 | 3 380,0 | - | - | 1992 |
| 34/7-A-3 AH | 0,0 | 5 183,0 | - | - | 2004 |
| 34/7-A-3 H | 0,0 | 4 583,0 | - | - | 1994 |
| 34/7-A-5 AH | 0,0 | 3 274,0 | - | - | 2000 |
| 34/7-A-5 H | 0,0 | 3 558,0 | - | - | 1992 |
| 34/7-A-2 AH | 0,0 | 3 630,0 | - | - | 1999 |
| 34/7-A-2 H | 0,0 | 3 975,0 | - | - | 1994 |
| 34/7-A-1 AH | 0,0 | 4 833,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.