34/7-C-1 H
Development, productionPluggedOil
Drilled by Saga Petroleum ASA with Scarabeo 5 in Vigdis, 17.01.1996 to 20.02.1996 (34 days), to 4 431,0 m.
Water depth283,0 m
Total depth4 431,0 m MD
Vertical depth2 390,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud17.01.1996
Completed20.02.1996
OperatorSaga Petroleum ASA
Position61,3804 N, 2,1035 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Vigdis gradient | 37,7 °C/km |
| Estimated at total depth from the gradient | 83 °C |
The gradient is the median of 12 released wells in Vigdis with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-C-1 AH same well | 0,0 | 3 234,0 | - | - | 2015 |
| 34/7-C-2 AH | 0,0 | 4 671,0 | - | - | 2001 |
| 34/7-C-2 H | 0,0 | 3 220,0 | - | - | 1995 |
| 34/7-C-4 H | 0,0 | 4 220,0 | - | - | 1999 |
| 34/7-C-3 AH | 0,0 | 6 085,0 | - | - | 2001 |
| 34/7-C-3 BH | 0,0 | 5 538,0 | - | - | 2020 |
| 34/7-C-3 H | 0,0 | 4 715,0 | - | - | 1996 |
| 34/7-C-5 AH | 0,2 | 3 930,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.