34/7-G-2 H
Development, injectionInjectingWater
Drilled by StatoilHydro ASA with Borgland Dolphin in Vigdis, 12.04.2008 to 25.05.2008 (43 days), to 6 375,0 m.
Water depth282,0 m
Total depth6 375,0 m MD
Vertical depth2 564,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBorgland Dolphin
Spud12.04.2008
Completed25.05.2008
OperatorStatoilHydro ASA
Position61,3788 N, 2,1059 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Vigdis gradient | 37,7 °C/km |
| Estimated at total depth from the gradient | 89 °C |
The gradient is the median of 12 released wells in Vigdis with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-G-1 H | 0,0 | 4 515,0 | - | - | 2007 |
| 34/7-G-4 AH | 0,0 | 5 050,0 | - | - | 2009 |
| 34/7-G-4 BH | 0,0 | 6 215,0 | - | - | 2009 |
| 34/7-G-4 CH | 0,0 | 5 688,0 | - | - | 2012 |
| 34/7-G-4 DH | 0,0 | 5 699,0 | - | - | 2016 |
| 34/7-G-4 H | 0,0 | 4 633,0 | - | - | 2009 |
| 34/7-G-3 H | 0,0 | 3 896,0 | - | - | 2007 |
| 34/7-U-15 | 0,0 | 740,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.