34/7-I-4 BH
Development, productionProducing
Drilled by Equinor Energy AS with COSLPromoter in Tordis, 08.11.2025 to 03.01.2026 (56 days), to 4 144,0 m.
Water depth201,0 m
Total depth4 144,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,1 m
Formation at total depth-
RigCOSLPromoter
Spud08.11.2025
Completed03.01.2026
OperatorEquinor Energy AS
Position61,2758 N, 2,1167 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tordis gradient | 37,1 °C/km |
| Estimated at total depth from the gradient | 149 °C |
The gradient is the median of 9 released wells in Tordis with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-I-4 AH same well | 0,0 | 3 938,0 | - | - | 1995 |
| 34/7-I-4 H same well | 0,0 | 2 880,0 | - | - | 1994 |
| 34/7-I-3 AH | 0,0 | 2 650,0 | - | - | 1996 |
| 34/7-I-3 BH | 0,0 | 2 312,0 | - | - | 1996 |
| 34/7-I-3 CH | 0,0 | 2 450,0 | - | - | 2016 |
| 34/7-I-3 H | 0,0 | 2 825,0 | - | - | 1993 |
| 34/7-U-14 | 0,1 | - | - | - | - |
| 34/7-R-1 H | 0,1 | 1 116,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.