34/7-K-2 H
Development, injectionInjectingWater
Drilled by Statoil Petroleum AS with Bideford Dolphin in Tordis, 04.07.2013 to 03.08.2013 (30 days), to 3 420,0 m.
Water depth202,0 m
Total depth3 420,0 m MD
Vertical depth2 305,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud04.07.2013
Completed03.08.2013
OperatorStatoil Petroleum AS
Position61,2762 N, 2,1203 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tordis gradient | 37,1 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 9 released wells in Tordis with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-K-1 H | 0,0 | 5 664,0 | - | - | 2002 |
| 34/7-K-3 AH | 0,0 | 3 499,0 | - | - | 2016 |
| 34/7-K-3 H | 0,0 | 4 608,0 | - | - | 2002 |
| 34/7-K-4 H | 0,0 | 5 077,0 | - | - | 2000 |
| 34/7-U-20 | 0,0 | 415,0 | - | - | 2012 |
| 34/7-I-2 AH | 0,0 | 3 650,0 | - | - | 1995 |
| 34/7-I-2 BH | 0,0 | 3 224,0 | - | - | 2015 |
| 34/7-I-2 H | 0,0 | 3 524,0 | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.