34/8-A-17 H
Development, productionClosedOil and gas and condensate
Drilled by Statoil Petroleum AS with Visund in Visund, 18.03.2011 to 27.03.2012 (375 days), to 7 520,0 m.
Water depth335,0 m
Total depth7 520,0 m MD
Vertical depth3 165,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud18.03.2011
Completed27.03.2012
OperatorStatoil Petroleum AS
Position61,3699 N, 2,4586 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 115 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-A-18 H | 0,0 | 6 122,0 | - | - | 2012 |
| 34/8-A-16 AH | 0,0 | 4 715,0 | - | - | 2015 |
| 34/8-A-16 BH | 0,0 | 5 794,0 | - | - | 2021 |
| 34/8-A-16 CH | 0,0 | 6 477,0 | - | - | 2022 |
| 34/8-A-16 DH | 0,0 | 5 750,0 | - | - | 2025 |
| 34/8-A-16 H | 0,0 | 4 177,0 | - | - | 2015 |
| 34/8-A-19 AH | 0,0 | 6 260,0 | - | - | 2004 |
| 34/8-A-19 BH | 0,0 | 5 502,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.