Fields / Visund / 34/8-A-20 AH
34/8-A-20 AH
Development, productionPluggedOil and gas
Drilled by Statoil Petroleum AS with Visund in Visund, 02.03.2016 to 10.03.2016 (8 days), to 4 647,0 m.
Water depth335,0 m
Total depth4 647,0 m MD
Vertical depth2 956,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud02.03.2016
Completed10.03.2016
OperatorStatoil Petroleum AS
Position61,3699 N, 2,4590 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 107 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-A-20 BH same well | 0,0 | 5 522,0 | - | - | 2023 |
| 34/8-A-20 CH same well | 0,0 | - | - | - | - |
| 34/8-A-20 H same well | 0,0 | 3 932,0 | - | - | 2016 |
| 34/8-A-21 H | 0,0 | 7 322,0 | - | - | 2002 |
| 34/8-A-19 AH | 0,0 | 6 260,0 | - | - | 2004 |
| 34/8-A-19 BH | 0,0 | 5 502,0 | - | - | 2021 |
| 34/8-A-19 H | 0,0 | 4 335,0 | - | - | 2002 |
| 34/8-A-22 H | 0,0 | 8 263,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.