Fields / Visund / 34/8-A-23 AH
34/8-A-23 AH
Development, productionClosedOil and gas
Drilled by Statoil Petroleum AS with Visund in Visund, 21.05.2015 to 01.06.2015 (11 days), to 6 465,0 m.
Water depth335,0 m
Total depth6 465,0 m MD
Vertical depth3 133,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud21.05.2015
Completed01.06.2015
OperatorStatoil Petroleum AS
Position61,3700 N, 2,4594 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 114 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-A-23 H same well | 0,0 | 6 616,0 | - | - | 2001 |
| 34/8-A-22 H | 0,0 | 8 263,0 | - | - | 2003 |
| 34/8-A-24 AH | 0,0 | 7 940,0 | - | - | 2014 |
| 34/8-A-24 H | 0,0 | 7 644,0 | - | - | 2014 |
| 34/8-A-25 AH | 0,0 | 5 449,0 | - | - | 2003 |
| 34/8-A-25 BH | 0,0 | 4 983,0 | - | - | 2007 |
| 34/8-A-25 CH | 0,0 | 4 687,0 | - | - | 2007 |
| 34/8-A-25 DH | 0,0 | 5 557,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.