34/8-A-33 H
Development, injectionInjectingCuttings
Drilled by StatoilHydro ASA with Visund in Visund, 27.07.2008 to 18.08.2008 (22 days), to 1 733,0 m.
Water depth335,0 m
Total depth1 733,0 m MD
Vertical depth1 689,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud27.07.2008
Completed18.08.2008
OperatorStatoilHydro ASA
Position61,3704 N, 2,4596 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 56 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-18 S | 0,0 | 6 068,0 | - | 1,70 | 2019 |
| 34/8-A-36 H | 0,0 | 5 031,0 | - | - | 2018 |
| 34/8-A-32 H | 0,0 | 6 760,0 | - | - | 2016 |
| 34/8-A-34 H | 0,0 | 7 458,0 | - | - | 2017 |
| 34/8-A-38 H | 0,0 | 4 977,0 | - | - | 2022 |
| 34/8-A-4 AH | 0,0 | 7 651,0 | - | - | 2002 |
| 34/8-A-4 BH | 0,0 | 7 579,0 | - | - | 2006 |
| 34/8-A-4 H | 0,0 | 5 658,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.