Fields / Visund Sør / 34/8-V-1 AH
34/8-V-1 AH
Development, productionClosedOil and gas
Drilled by Statoil Petroleum AS with Scarabeo 5 in Visund Sør, 05.06.2014 to 28.06.2014 (23 days), to 5 160,0 m.
Water depth291,0 m
Total depth5 160,0 m MD
Vertical depth2 940,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud05.06.2014
Completed28.06.2014
OperatorStatoil Petroleum AS
Position61,3005 N, 2,3638 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Visund Sør report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-V-1 BH same well | 0,0 | 3 629,5 | - | - | 2026 |
| 34/8-V-1 H same well | 0,0 | 3 345,0 | - | - | 2013 |
| 34/8-V-4 AH | 0,0 | 4 160,0 | - | - | 2011 |
| 34/8-V-4 BY1H | 0,0 | 4 721,0 | - | - | 2012 |
| 34/8-V-4 BY2H | 0,0 | 4 815,0 | - | - | 2012 |
| 34/8-V-4 CH | 0,0 | 3 644,0 | - | - | 2019 |
| 34/8-V-4 DH | 0,0 | 6 905,2 | - | - | 2025 |
| 34/8-V-4 EH | 0,0 | 6 937,0 | - | - | 2026 |
Casing and formation tests
No casing programme is reported for this wellbore.