35/11-A-13 H
Development, productionProducing
Drilled by Equinor Energy AS with Transocean Spitsbergen in Fram, 27.08.2023 to 11.10.2023 (45 days), to 5 192,0 m.
Water depth357,0 m
Total depth5 192,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depth-
RigTransocean Spitsbergen
Spud27.08.2023
Completed11.10.2023
OperatorEquinor Energy AS
Position61,0847 N, 3,5165 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Fram gradient | 41,1 °C/km |
| Estimated at total depth from the gradient | 201 °C |
The gradient is the median of 12 released wells in Fram with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/11-A-14 H | 0,0 | 5 890,0 | - | - | 2002 |
| 35/11-A-11 H | 0,0 | 5 820,0 | - | - | 2002 |
| 35/11-A-12 AH | 0,0 | 5 528,0 | - | - | 2002 |
| 35/11-A-12 H | 0,0 | 3 436,0 | - | - | 2002 |
| 35/11-A-21 Y1H | 0,1 | 5 737,0 | - | - | 2003 |
| 35/11-A-21 Y2H | 0,1 | 5 433,0 | - | - | 2003 |
| 35/11-A-24 AH | 0,1 | 4 426,0 | - | - | 2003 |
| 35/11-A-24 H | 0,1 | 3 250,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.