35/11-B-31 H
Development, injectionPlugged and abandonedCuttings
Drilled by Norsk Hydro Petroleum AS with Bideford Dolphin in Fram, 25.01.2007 to 08.02.2007 (14 days), to 1 041,0 m.
Water depth356,0 m
Total depth1 041,0 m MD
Vertical depth1 015,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud25.01.2007
Completed08.02.2007
OperatorNorsk Hydro Petroleum AS
Position61,0403 N, 3,5761 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Fram gradient | 41,1 °C/km |
| Estimated at total depth from the gradient | 30 °C |
The gradient is the median of 12 released wells in Fram with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/11-B-11 AY1H | 0,1 | 4 779,0 | - | - | 2019 |
| 35/11-B-11 AY2H | 0,1 | 5 287,0 | - | - | 2019 |
| 35/11-B-11 BH | 0,1 | - | - | - | 2026 |
| 35/11-B-11 H | 0,1 | 5 643,0 | - | - | 2007 |
| 35/11-B-12 AH | 0,1 | 6 435,0 | - | - | 2007 |
| 35/11-B-12 BY1H | 0,1 | 6 041,0 | - | - | 2019 |
| 35/11-B-12 BY2H | 0,1 | 5 598,0 | - | - | 2019 |
| 35/11-B-12 H | 0,1 | 3 968,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.