Fields / 35/6-5 S
35/6-5 S
Exploration, wildcatPlugged and abandonedDry
Drilled by Aker BP ASA with Deepsea Nordkapp, 10.01.2025 to 01.02.2025 (22 days), to 3 985,0 m.
Water depth336,0 m
Total depth3 985,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud10.01.2025
Completed01.02.2025
OperatorAker BP ASA
Position61,6827 N, 3,7309 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
No casing programme is reported for this wellbore.