35/8-P-13 H
Development, productionProducingGas and condensate
Drilled by Statoil Petroleum AS with Bideford Dolphin in Vega, 19.02.2010 to 06.04.2010 (46 days), to 3 842,0 m.
Water depth377,0 m
Total depth3 842,0 m MD
Vertical depth3 624,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud19.02.2010
Completed06.04.2010
OperatorStatoil Petroleum AS
Position61,3711 N, 3,3770 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Vega gradient | 38,3 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 4 released wells in Vega with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.