Fields / Gjøa / 35/9-B-1 H

35/9-B-1 H

Development, observationPluggedOil

Drilled by GDF SUEZ E&P Norge AS with Transocean Searcher in Gjøa, 07.11.2010 to 23.01.2011 (77 days), to 3 471,0 m.

Water depth363,0 m
Total depth3 471,0 m MD
Vertical depth2 497,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTransocean Searcher
Spud07.11.2010
Completed23.01.2011
OperatorGDF SUEZ E&P Norge AS
Position61,3403 N, 3,9588 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gjøa gradient36,4 °C/km
Estimated at total depth from the gradient81 °C

The gradient is the median of 7 released wells in Gjøa with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
35/9-B-1 AH same well0,04 419,0--2011
35/9-B-1 BH same well0,0----
35/9-B-2 H0,02 925,0--2010
35/9-B-3 H0,05 845,0--2010
35/9-C-1 AY1H0,16 449,0--2011
35/9-C-1 AY2H0,16 075,0--2011
35/9-C-1 Y1H0,12 860,0--2009
35/9-C-1 Y2H0,1----

Casing and formation tests

No casing programme is reported for this wellbore.