35/9-C-2 AH
Development, productionClosedOil
Drilled by Statoil Petroleum AS with Transocean Searcher in Gjøa, 26.05.2010 to 02.07.2010 (37 days), to 5 835,0 m.
Water depth363,0 m
Total depth5 835,0 m MD
Vertical depth2 345,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTransocean Searcher
Spud26.05.2010
Completed02.07.2010
OperatorStatoil Petroleum AS
Position61,3408 N, 3,9582 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gjøa gradient | 36,4 °C/km |
| Estimated at total depth from the gradient | 75 °C |
The gradient is the median of 7 released wells in Gjøa with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/9-C-2 H same well | 0,0 | 4 445,0 | - | - | 2009 |
| 35/9-C-3 Y1H | 0,0 | 4 703,0 | - | - | 2009 |
| 35/9-C-3 Y2H | 0,0 | 5 202,0 | - | - | 2010 |
| 35/9-C-1 AY1H | 0,0 | 6 449,0 | - | - | 2011 |
| 35/9-C-1 AY2H | 0,0 | 6 075,0 | - | - | 2011 |
| 35/9-C-1 Y1H | 0,0 | 2 860,0 | - | - | 2009 |
| 35/9-C-1 Y2H | 0,0 | - | - | - | - |
| 35/9-C-4 Y1H | 0,0 | 4 356,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.