Fields / 6201/11-3
6201/11-3
Exploration, wildcatSuspendedDry
Drilled by Lundin Norway AS with Bredford Dolphin, 08.05.2012 to 16.06.2012 (39 days), to 2 120,0 m in the Jorsalfare Formation.
Water depth382,5 m
Total depth2 120,0 m MD
Vertical depth2 120,0 m TVD
Bottom-hole temperature-
Max inclination1,7°
Rotary table25,0 m
Formation at total depthJorsalfare Formation
RigBredford Dolphin
Spud08.05.2012
Completed16.06.2012
OperatorLundin Norway AS
Position62,0458 N, 1,5036 E
Formations
12 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6201/11-3 R same well | 0,0 | 3 000,0 | 115 °C | 1,70 | 2012 |
| 6201/11-1 | 1,7 | 3 850,0 | - | 1,70 | 1987 |
| 6201/11-2 | 5,2 | 3 778,0 | 150 °C | 1,55 | 1991 |
| 33/2-1 | 6,4 | 4 459,0 | 156 °C | 1,93 | 2014 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 498,0 | 36" | 498,0 | - |
| Surface casing | 20" | 748,0 | 26" | 755,0 | 1,40 FIT |
| Pilot hole | - | 836,0 | 9 7/8" | 836,0 | - |
| Intermediate | 16" | 1 328,0 | 20" | 1 372,0 | 1,64 LOT |
| Intermediate | 13 3/8" | 2 058,0 | 17 1/2" | 2 120,0 | 1,82 LOT |
Mud weight
4 measurements, one dot each, 1,20 to 1,70 g/cm³ against measured depth, water base, water base.