Fields / 6205/3-1 R
6205/3-1 R
Exploration, wildcatPlugged and abandonedShows
Drilled by Norsk Hydro Produksjon AS with Mærsk Jutlander, 20.09.1990 to 30.11.1990 (71 days), to 5 264,0 m in the Spekk Formation.
Water depth159,0 m
Total depth5 264,0 m MD
Vertical depth5 253,0 m TVD
Bottom-hole temperature155 °C
Max inclination-
Rotary table23,0 m
Formation at total depthSpekk Formation
RigMærsk Jutlander
Spud20.09.1990
Completed30.11.1990
OperatorNorsk Hydro Produksjon AS
Position62,9524 N, 5,9439 E
Formations
28 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 155 °C |
| Drill-stem test at 4 344,1 m | 138 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6205/3-1 same well | 0,0 | 4 300,0 | 122 °C | 1,31 | 1989 |
| 6305/12-1 | 11,1 | 4 302,0 | 146 °C | 1,38 | 1991 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Intermediate | 9 5/8" | 4 284,0 | 12 1/4" | 4 290,0 | - |
| Liner | 7" | 5 264,0 | 8 1/2" | 5 264,0 | - |
Mud weight
65 measurements, one dot each, 1,20 to 1,76 g/cm³ against measured depth, dummy, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 4 324,1 - 4 344,1 | 12,7 | 36,1 | 138 | - | - |