Fields / Ormen Lange / 6305/5-B-7 H

6305/5-B-7 H

Development, productionProducingGas

Drilled by A/S Norske Shell with Leiv Eiriksson in Ormen Lange, 17.11.2007 to 30.04.2009 (530 days), to 3 536,0 m.

Water depth855,0 m
Total depth3 536,0 m MD
Vertical depth2 753,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table36,0 m
Formation at total depth-
RigLeiv Eiriksson
Spud17.11.2007
Completed30.04.2009
OperatorA/S Norske Shell
Position63,5284 N, 5,3879 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Ormen Lange gradient37,8 °C/km
Estimated at total depth from the gradient74 °C

The gradient is the median of 4 released wells in Ormen Lange with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6305/5-B-6 H0,04 294,0--2008
6305/5-B-8 H0,0----
6305/5-B-5 H0,0----
6305/5-B-3 H0,03 150,0--2006
6305/5-B-2 AH0,02 868,0--2007
6305/5-B-2 H0,02 980,0--2006
6305/5-B-4 H0,0----
6305/5-B-1 H0,0----

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗