Fields / Ormen Lange / 6305/5-C-3 AH
6305/5-C-3 AH
Development, productionProducingGas
Drilled by A/S Norske Shell with Transocean Barents in Ormen Lange, 21.06.2022 to 08.10.2022 (109 days), to 3 826,0 m.
Water depth925,0 m
Total depth3 826,0 m MD
Vertical depth2 729,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depth-
RigTransocean Barents
Spud21.06.2022
Completed08.10.2022
OperatorA/S Norske Shell
Position63,5727 N, 5,3483 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ormen Lange gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 71 °C |
The gradient is the median of 4 released wells in Ormen Lange with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6305/5-C-3 H same well | 0,0 | 4 632,0 | - | 1,71 | 2022 |
| 6305/5-C-2 AH | 0,0 | 3 214,0 | - | - | 2011 |
| 6305/5-C-2 H | 0,0 | 2 877,0 | - | - | 2011 |
| 6305/5-C-7 H | 0,0 | 4 106,0 | - | - | 2011 |
| 6305/5-C-6 H | 0,0 | 3 497,0 | - | - | 2011 |
| 6305/5-C-5 H | 0,0 | 4 605,0 | - | - | 2013 |
| 6305/5-U-4 | 1,0 | - | - | - | - |
| 6305/4-U-3 | 2,4 | 1 751,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.