Fields / Ormen Lange / 6305/7-D-4 H
6305/7-D-4 H
Development, productionProducingGas
Drilled by A/S Norske Shell with Transocean Barents in Ormen Lange, 09.03.2022 to 23.04.2022 (45 days), to 3 200,0 m.
Water depth853,8 m
Total depth3 200,0 m MD
Vertical depth2 833,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depth-
RigTransocean Barents
Spud09.03.2022
Completed23.04.2022
OperatorA/S Norske Shell
Position63,3858 N, 5,3142 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ormen Lange gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 77 °C |
The gradient is the median of 4 released wells in Ormen Lange with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6305/7-D-3 H | 0,0 | 3 512,0 | - | - | 2009 |
| 6305/7-D-2 H | 0,0 | 3 857,0 | - | - | 2010 |
| 6305/7-D-8 H | 0,0 | 3 705,0 | - | - | 2011 |
| 6305/7-D-7 AH | 0,0 | 3 405,0 | - | - | 2010 |
| 6305/7-D-7 H | 0,0 | 3 130,0 | - | - | 2009 |
| 6305/7-D-1 H | 0,0 | 3 482,0 | - | - | 2011 |
| 6305/7-D-6 H | 0,0 | 1 569,0 | - | - | 2009 |
| 6305/7-D-5 H | 0,0 | 5 337,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.