Fields / 6306/3-1 S
6306/3-1 S
Exploration, wildcatPlugged and abandonedDry
Drilled by PGNiG Upstream Norway AS with Borgland Dolphin, 30.09.2021 to 11.12.2021 (72 days), to 2 384,0 m in the Basement.
Water depth241,0 m
Total depth2 384,0 m MD
Vertical depth2 384,0 m TVD
Bottom-hole temperature-
Max inclination4,2°
Rotary table31,0 m
Formation at total depthBasement
RigBorgland Dolphin
Spud30.09.2021
Completed11.12.2021
OperatorPGNiG Upstream Norway AS
Position63,8858 N, 6,7693 E
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6306/3-2 | 14,2 | 1 799,0 | 70 °C | 1,40 | 2022 |
| 6406/12-4 A | 14,8 | 4 058,0 | 134 °C | 1,54 | 2015 |
| 6406/12-4 S | 14,8 | 4 318,0 | 128 °C | 1,54 | 2015 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 337,8 | 36" | 338,2 | - |
| Intermediate | 20" | 651,5 | 26" | 657,0 | 1,47 FIT |
| Intermediate | 13 3/8" | 1 041,0 | 17 1/2" | 1 048,0 | 1,71 FIT |
| Intermediate | 9 5/8" | 2 091,2 | 12 1/4" | 2 100,0 | 1,86 LOT |
| - | - | 2 365,0 | 12 1/4" | 2 365,0 | - |
| Open hole | - | 2 383,8 | 8 1/2" | 2 383,8 | - |
Mud weight
24 measurements, one dot each, 1,20 to 1,49 g/cm³ against measured depth, glydril plus, glydrill plus, glydrill pluss, glydril plus, kill mud, obm versatec, spud mud, versatec obm.