Fields / 6306/5-2
6306/5-2
Exploration, wildcatPlugged and abandonedDry
Drilled by Repsol Exploration Norge AS with Bredford Dolphin, 21.08.2015 to 11.10.2015 (51 days), to 3 217,0 m in the Intra Melke Fm Ss.
Water depth226,0 m
Total depth3 217,0 m MD
Vertical depth3 215,0 m TVD
Bottom-hole temperature115 °C
Max inclination4,2°
Rotary table25,0 m
Formation at total depthIntra Melke Fm Ss
RigBredford Dolphin
Spud21.08.2015
Completed11.10.2015
OperatorRepsol Exploration Norge AS
Position63,7312 N, 6,5742 E
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 115 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6306/5-1 | 3,6 | 2 050,0 | 74 °C | 1,66 | 1997 |
| 6306/6-2 | 7,0 | 2 080,0 | 74 °C | 1,63 | 2009 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 342,0 | 36" | 344,5 | - |
| Surface casing | 20" | 1 053,0 | 26" | 1 060,0 | 1,73 LOT |
| Pilot hole | - | 1 060,0 | 9 7/8" | 1 060,0 | - |
| Intermediate | 13 3/8" | 1 737,0 | 17 1/2" | 1 746,0 | 1,81 LOT |
| Intermediate | 9 5/8" | 2 742,0 | 12 1/4" | 2 752,0 | 1,88 LOT |
| Open hole | - | 3 217,0 | 8 1/2" | 3 217,0 | - |
Mud weight
12 measurements, one dot each, 1,00 to 1,60 g/cm³ against measured depth, water.